Author: nuntawob
-

Three More Interior Doors – July-October 2026
In my last post I made my first interior door. In this post I continue building interior doors, building the remaining three doors that will go in the guest hallway.
-

My First Interior Door – May/June 2026.
In this post I describe the activities that took my unfinished dry fitted door to one that is hung in place.
-

Interior Doors – February through May 2026
After considerable time off for the holidays and beyond, I slowly got back to work starting in February. It’s funny the role momentum plays. Having not done any construction work on the house since moving in, getting back to it required a bit of a push. My attention initially turned to interior doors. A lot…
-

Moving In – October/November 2025
Following the installation of the stainless steel backsplash in the kitchen, the house was in a state where I could move in. Obviously there was still a lot to do, but all the things I needed to function were in place. I would spend most of my time preparing for the move. This meant a…
-

Preparations for Moving In – August, September 2025
After returning from vacation, the plan was to turn my attention to the garage workshop. The idea was to prepare for the upcoming trim work that was facing me inside the house. A lot of thought went into it, but no real action. I was considering getting several new pieces of equipment, including an 8″…
-

Final Inspection – July 2025
The countertop installers arrived on the first of the month. The started by placing the slabs on the base cabinets. The granite countertop, where the cooktop will be, was delivered with the opening for the cooktop not fully cutout in order to retain its integrity during transport. This can be seen if you look closely…
-

Kitchen, Garage, and other bits and pieces – May and June 2025
After a really nice week away, my first task upon returning to the house was to figure out how to hook up the vent hood. Just prior to leaving on vacation, I was speaking with a metal fabricator about creating custom piping to route the vent exhaust through the limited space in the cabinet above…
-

Kitchen and More – April 2025
To my surprise, the extra cabinet that will go above the cooktop and the refrigerator side panel arrived early. I expected it to arrive mid month, but instead it arrived the first of April. So, my plan to install the overhead lights in the kitchen were put on hold. To prepare for the continuation of…
-

Flooring Continued, Kitchen Electrical Work, and Painting the Master Bedroom – March 2025
At the end of the last post, the flooring installation was paused as I waited for the extra material to arrive so they could finish the job. Before that, they finished the master bedroom, which took two days, and then started on the office. I forgot to show a picture of the master bedroom before…
-

Wood Flooring and Kitchen Cabinets – February 2025
The work I’m doing on this house requires a permit, which has an expiration date. That expiration date is pushed out by six months after each inspection that has passed. My current expiration date is April 27th, so I have to keep this in mind when deciding what to work on. My next inspection will…