Author: nuntawob

  • Guest Bathroom Tiling – January 2025

    Guest Bathroom Tiling – January 2025

    Before leaving on vacation in mid December of 2024, I took advantage of a few days I had available and set and grouted the mosaic tiles in the shower. I started by dry fitting them in order to determine the cuts needed to accommodate the drain opening. Then it was time to actually set the…

  • Guest Bathroom – November 2024

    Guest Bathroom – November 2024

    The last post finished with me having just finished taping the drywall in the guest bathroom. So we start this post with the various coatings of that taping job. After the first cover coat of the tape, we apply a second to widen the coverage in order to flatten the seams. In between each coating,…

  • Guest Bathroom – October 2024

    Guest Bathroom – October 2024

    Having made the master bathroom functional, it was time to get started on the guest bathroom. This was the last room in the house that had been untouched since the demolition long ago. I left this room until last because it was where the only working toilet and sink resided. Now that the toilet in…

  • Master Bathroom – September 2024

    Master Bathroom – September 2024

    In my last post about the master bathroom, I had picked up the baseboards and glued together the two pieces that would form the whole. They were now ready to be installed. I did this along the long walls first, then went into the toilet alcove, where I had a bit of an issue that…

  • Drafting Table Top – September 2024

    Drafting Table Top – September 2024

    Since I was no longer driving toward a mid November move in date for the house, I decided to indulge myself with another side project. I actually started this while working on the wall repair in the master bathroom I documented in the last post, but did not complete it until this month, so I…

  • Master Bathroom – July/August 2024

    Master Bathroom – July/August 2024

    Having put on hold the work on the master bathroom while I waited for my shower wall tiles to arrive, I shifted my attention to the great room and adjoining areas, as described in the previous post. But now it was time to pick up where I left off in the master bathroom. The shower…

  • Hot Water Tank Installation and Major Painting – June/July 2024

    Hot Water Tank Installation and Major Painting – June/July 2024

    While waiting for the shower wall tiles and extra floor tiles to arrive, I decided it was a good time to hook up the hot water heater and install a utility sink in the garage. My original plan was to use the existing hot water heater, since it wasn’t that old. Here is the only…

  • Master Bathroom – April/May 2024

    Master Bathroom – April/May 2024

    Returning my attention to the master bathroom, the objective was to make it a functioning bathroom. This did not mean it would be fully finished; only finished enough that I could use it if I was living in the house. So I did not intend to go so far as have the baseboard done and…

  • Guest Bedroom, Laundry Room, and Master Closets – March/April 2024

    Guest Bedroom, Laundry Room, and Master Closets – March/April 2024

    The guest bedroom was the first room where I did any drywall work. I started there because I figured it would be the least used room, and if I was going to make any mistakes, I’d rather it not be something I saw every day. Fortunately it went very well and I was happy with…

  • Office Drywall Finishing – February 2024

    Office Drywall Finishing – February 2024

    Similar to the workshop, I had a lot of things to clear out of the front bedroom I intend to use as an office. This took a couple of days and required the help of a friend to move a very large armoire that had been placed there by the movers. Thanks Paul! I put…